product thumbnail

项目案例
(Reference)

“Further Evolved “Ubiquity on the Road” With faster, more accurate information, LSIS’ high-tech freeway traffic management system facilitates safe driving and efficient communication on the freeway.

  • Main Line
  • Metro Line
  • 下载
  • 客户支持

Main Line

Kyungbu High Speed Railway

  • - HSR Signalling System
      Consortium Leader[Phase 2 of Kyungbu HSR Project
      Automatic Train Control System[ATC, Onbroad & Wayside Systems]
      Train Traffic Management System[TMS]
      System Engineering
      Safety Facilities
  • - HSR Phase 2 CTC Implementation
       Localized and Implemented CTC for HSR Phase 2
       Primary Backup Railway traffic Control Centers
  • - HSR Electrical System

Reference-s1.jpg

Metro Line

Seoul Metro Phase 1 Line 3 & 4

  • - CTC, Control Facility
  • - Electrical Power System Facility:
      7 DC Substation (Line 3)
      5 DC Substation (Line 4)

Reference-s2.jpg

Seoul Metro Phase 2 Line 6

  • - CTC, Control Facility
  • - Signalling
  • - Electrical Power System Facility: 12 DC Substation

Reference-s3.jpg

Line 7 & 8

  • - CTC, Control Facility
  • - Electrical Power System Facility: 11 DC Substation

Reference-s4.jpg

Busan Line 1 & 2

  • - Signalling, TTC, ATC, Simulation System

Reference-s5.jpg

Incheon Line 1

  • - Electrical Power System Facility: 10 DC Substation

Reference-s6.jpg

Daegu Line 1 & 2

  • - Electrical Power System Facility: 10 DC Substation (Line 1) 9 + 1 DC Substation (Line 2, Extension)

Reference-s7.jpg

LRT

Incheon International Airport Shuttle Train

E&M Work

  • - Supply / Installation and Operation / Maintenance of IAT (Intra Airport Transit
  • - System as a Consortium Leader
  • - Managed Consortium Project Control, System Integration, Operation and Maintenance Between 03.11~Now
  • - LSIS Delivered and Performed
      Electrical Power System(AC SWGR, DC SWGR, Rectifier, SCADA, Etc.)
      Communication System
      Platform Screen Doors
      1st Unmanned LRT in Korea

Incheon Line 2

E&M Consortium

  • - 12 Substations
  • - 6 Energy Storages
  • - SCADA
  • - Electric Work
  • - 27 stations. PSD

Gwangmyoung

E&M Works

  • - LSIS will fabricate, purchase and deliver all mechanical, electrical and automation systems
  • - Except for civil / architectural works
  • - R/S, electrical power facilities, signalling, communication system, PSD and catenary system, etc.
  • - Sub-system engineering services to implement independent systems & Integration
  • - Providing total engineering services for train operation system.

Overseas

Thailand ST1 & ST4

  • - ST1 Signaling & Communication System
       CTC : 52 Station
       CIC: 14 Station
       Block System: 14 Sets
       Level crossing: 32 Sets
       Switch: 127 Sets
       Track Circuit: 150 Sets
       Signaling Device: 342 Sets
  • - ST4 Signaling & Communication System
       CTC : 7 Station
       CBI: 7 Station ( LS-EIS520V)
       Block System: 7 Sets
       Communication System: 7 Sets
       Switch: 92 Sets
       Track Circuit: 357 Sets
       Signaling Device: 131 Sets
       Power Supply: 7 Sets

Reference-s8.jpg

Main Line

Kyungbu High Speed Railway

  • - HSR Signalling System
      Consortium Leader[Phase 2 of Kyungbu HSR Project
      Automatic Train Control System[ATC, Onbroad & Wayside Systems]
      Train Traffic Management System[TMS]
      System Engineering
      Safety Facilities
  • - HSR Phase 2 CTC Implementation
       Localized and Implemented CTC for HSR Phase 2
       Primary Backup Railway traffic Control Centers
  • - HSR Electrical System

Reference-s1.jpg

Metro Line

Seoul Metro Phase 1 Line 3 & 4

  • - CTC, Control Facility
  • - Electrical Power System Facility:
      7 DC Substation (Line 3)
      5 DC Substation (Line 4)

Reference-s2.jpg

Seoul Metro Phase 2 Line 6

  • - CTC, Control Facility
  • - Signalling
  • - Electrical Power System Facility: 12 DC Substation

Reference-s3.jpg

Line 7 & 8

  • - CTC, Control Facility
  • - Electrical Power System Facility: 11 DC Substation

Reference-s4.jpg

Busan Line 1 & 2

  • - Signalling, TTC, ATC, Simulation System

Reference-s5.jpg

Incheon Line 1

  • - Electrical Power System Facility: 10 DC Substation

Reference-s6.jpg

Daegu Line 1 & 2

  • - Electrical Power System Facility: 10 DC Substation (Line 1) 9 + 1 DC Substation (Line 2, Extension)

Reference-s7.jpg

LRT

Incheon International Airport Shuttle Train

E&M Work

  • - Supply / Installation and Operation / Maintenance of IAT (Intra Airport Transit
  • - System as a Consortium Leader
  • - Managed Consortium Project Control, System Integration, Operation and Maintenance Between 03.11~Now
  • - LSIS Delivered and Performed
      Electrical Power System(AC SWGR, DC SWGR, Rectifier, SCADA, Etc.)
      Communication System
      Platform Screen Doors
      1st Unmanned LRT in Korea

Incheon Line 2

E&M Consortium

  • - 12 Substations
  • - 6 Energy Storages
  • - SCADA
  • - Electric Work
  • - 27 stations. PSD

Gwangmyoung

E&M Works

  • - LSIS will fabricate, purchase and deliver all mechanical, electrical and automation systems
  • - Except for civil / architectural works
  • - R/S, electrical power facilities, signalling, communication system, PSD and catenary system, etc.
  • - Sub-system engineering services to implement independent systems & Integration
  • - Providing total engineering services for train operation system.

Overseas

Thailand ST1 & ST4

  • - ST1 Signaling & Communication System
       CTC : 52 Station
       CIC: 14 Station
       Block System: 14 Sets
       Level crossing: 32 Sets
       Switch: 127 Sets
       Track Circuit: 150 Sets
       Signaling Device: 342 Sets
  • - ST4 Signaling & Communication System
       CTC : 7 Station
       CBI: 7 Station ( LS-EIS520V)
       Block System: 7 Sets
       Communication System: 7 Sets
       Switch: 92 Sets
       Track Circuit: 357 Sets
       Signaling Device: 131 Sets
       Power Supply: 7 Sets

Reference-s8.jpg

下载

主题 分类 语言 修改日期

客户支持

常见问题 more
联系我们 more
top