“Further Evolved “Ubiquity on the Road” With faster, more accurate information, LSIS’ high-tech freeway traffic management system facilitates safe driving and efficient communication on the freeway.
Main Line
Kyungbu High Speed Railway
- - HSR Signalling System
Consortium Leader[Phase 2 of Kyungbu HSR Project
Automatic Train Control System[ATC, Onbroad & Wayside Systems]
Train Traffic Management System[TMS]
System Engineering
Safety Facilities
- - HSR Phase 2 CTC Implementation
Localized and Implemented CTC for HSR Phase 2
Primary Backup Railway traffic Control Centers - - HSR Electrical System
Metro Line
Seoul Metro Phase 1 Line 3 & 4
- - CTC, Control Facility
- - Electrical Power System Facility:
7 DC Substation (Line 3)
5 DC Substation (Line 4)
Seoul Metro Phase 2 Line 6
- - CTC, Control Facility
- - Signalling
- - Electrical Power System Facility: 12 DC Substation
Line 7 & 8
- - CTC, Control Facility
- - Electrical Power System Facility: 11 DC Substation
Busan Line 1 & 2
- - Signalling, TTC, ATC, Simulation System
Incheon Line 1
- - Electrical Power System Facility: 10 DC Substation
Daegu Line 1 & 2
- - Electrical Power System Facility: 10 DC Substation (Line 1) 9 + 1 DC Substation (Line 2, Extension)
LRT
Incheon International Airport Shuttle Train
E&M Work
- - Supply / Installation and Operation / Maintenance of IAT (Intra Airport Transit
- - System as a Consortium Leader
- - Managed Consortium Project Control, System Integration, Operation and Maintenance Between 03.11~Now
- - LSIS Delivered and Performed
Electrical Power System(AC SWGR, DC SWGR, Rectifier, SCADA, Etc.)
Communication System
Platform Screen Doors
1st Unmanned LRT in Korea
Incheon Line 2
E&M Consortium
- - 12 Substations
- - 6 Energy Storages
- - SCADA
- - Electric Work
- - 27 stations. PSD
Gwangmyoung
E&M Works
- - LSIS will fabricate, purchase and deliver all mechanical, electrical and automation systems
- - Except for civil / architectural works
- - R/S, electrical power facilities, signalling, communication system, PSD and catenary system, etc.
- - Sub-system engineering services to implement independent systems & Integration
- - Providing total engineering services for train operation system.
Overseas
Thailand ST1 & ST4
- - ST1 Signaling & Communication System
CTC : 52 Station
CIC: 14 Station
Block System: 14 Sets
Level crossing: 32 Sets
Switch: 127 Sets
Track Circuit: 150 Sets
Signaling Device: 342 Sets
- - ST4 Signaling & Communication System
CTC : 7 Station
CBI: 7 Station ( LS-EIS520V)
Block System: 7 Sets
Communication System: 7 Sets
Switch: 92 Sets
Track Circuit: 357 Sets
Signaling Device: 131 Sets
Power Supply: 7 Sets
Main Line
Kyungbu High Speed Railway
- - HSR Signalling System
Consortium Leader[Phase 2 of Kyungbu HSR Project
Automatic Train Control System[ATC, Onbroad & Wayside Systems]
Train Traffic Management System[TMS]
System Engineering
Safety Facilities
- - HSR Phase 2 CTC Implementation
Localized and Implemented CTC for HSR Phase 2
Primary Backup Railway traffic Control Centers - - HSR Electrical System
Metro Line
Seoul Metro Phase 1 Line 3 & 4
- - CTC, Control Facility
- - Electrical Power System Facility:
7 DC Substation (Line 3)
5 DC Substation (Line 4)
Seoul Metro Phase 2 Line 6
- - CTC, Control Facility
- - Signalling
- - Electrical Power System Facility: 12 DC Substation
Line 7 & 8
- - CTC, Control Facility
- - Electrical Power System Facility: 11 DC Substation
Busan Line 1 & 2
- - Signalling, TTC, ATC, Simulation System
Incheon Line 1
- - Electrical Power System Facility: 10 DC Substation
Daegu Line 1 & 2
- - Electrical Power System Facility: 10 DC Substation (Line 1) 9 + 1 DC Substation (Line 2, Extension)
LRT
Incheon International Airport Shuttle Train
E&M Work
- - Supply / Installation and Operation / Maintenance of IAT (Intra Airport Transit
- - System as a Consortium Leader
- - Managed Consortium Project Control, System Integration, Operation and Maintenance Between 03.11~Now
- - LSIS Delivered and Performed
Electrical Power System(AC SWGR, DC SWGR, Rectifier, SCADA, Etc.)
Communication System
Platform Screen Doors
1st Unmanned LRT in Korea
Incheon Line 2
E&M Consortium
- - 12 Substations
- - 6 Energy Storages
- - SCADA
- - Electric Work
- - 27 stations. PSD
Gwangmyoung
E&M Works
- - LSIS will fabricate, purchase and deliver all mechanical, electrical and automation systems
- - Except for civil / architectural works
- - R/S, electrical power facilities, signalling, communication system, PSD and catenary system, etc.
- - Sub-system engineering services to implement independent systems & Integration
- - Providing total engineering services for train operation system.
Overseas
Thailand ST1 & ST4
- - ST1 Signaling & Communication System
CTC : 52 Station
CIC: 14 Station
Block System: 14 Sets
Level crossing: 32 Sets
Switch: 127 Sets
Track Circuit: 150 Sets
Signaling Device: 342 Sets
- - ST4 Signaling & Communication System
CTC : 7 Station
CBI: 7 Station ( LS-EIS520V)
Block System: 7 Sets
Communication System: 7 Sets
Switch: 92 Sets
Track Circuit: 357 Sets
Signaling Device: 131 Sets
Power Supply: 7 Sets